国产粗话肉麻对白在线播放丨久久久免费精品re6丨亚洲精品久久一区二区三区777丨人妻丰满熟妇av无码区乱丨亚洲性夜夜综合久久7777

CN

New Products Catalog

RFQ List
For any inquiries, please contact our specialists
Download Form

Remove RFQ Item

Technical service
FAQ

Standard Product Development Cycle?

Hetian's standard development cycle adapts dynamically to product complexity, with three core phases: design verification, prototype trial, and batch validation:

 

Phase 1: Design Stage (7-15 days)

  ? Technical Feasibility: Rapid CAD design and simulation using mature processes (e.g., aluminum forging, stamping).

  ? Prototyping: Initial samples via manual/RPT (Rapid Prototyping Tech, e.g., 3D printing) for functional validation.

 

 Phase 2: Validation Stage (15-30 days)

  ? Performance Testing: Fatigue tests and dimensional inspection in CNAS-accredited labs, ensuring compliance (e.g., German OEM standards).

  ? Process Optimization: Pilot runs to refine mold parameters and line layout, mitigating mass-production risks.

 

Phase 3: Batch Validation (10-15 days)

  ? Supply Chain Synergy: Concurrent raw material sourcing and supplier development (e.g., rubber damper partners) to compress lead times.

  ? Mass-Production Launch: PPAP (Production Part Approval Process) documentation ensures seamless transition post-customer approval.

  ? Critical Factors: Cycles may extend to 3 months for special materials (e.g., imported aluminum alloys) or complex structures (e.g., multi-link suspensions).

 

Major Project Development Cycle?

For OEM projects, Hetian employs a "Simultaneous Engineering + Phased Validation" model with the following workflow:

 

Phase 1: Simultaneous Engineering (3-6 months)

  ? Requirements Alignment: Jointly define technical specs with OEMs (e.g., load requirements for lightweight aluminum forgings), reducing sourcing decision time.

  ? Co-design: 65 engineers participate in OEM's Digital Mock-Up (DMU) reviews to optimize structural compatibility.

 

Phase 2: Road Testing & Validation (2-4 months)

 ? Prototype Iteration: A-Sample (functional) → B-Sample (performance) → C-Sample (process stability) validation.

 ? Environmental Testing: Simulate extreme conditions (-40°C~120°C/salt spray) to ensure 10-year/200,000-km lifespan compliance.

 

Phase 3: Production Ramp-up (3-6 months)

? Line Expansion (if required): Install automated forging lines and assembly equipment.

? SOP Launch: Pass OEM Run-at-Rate Audit for zero-defect delivery.

Case Study: Hetian delivered an aluminum front control arm for an EV OEM in merely 8 months, cutting mold commissioning time by 30% via simultaneous engineering.

 

Key Factors for Cycle Variance

Technology Maturity: Standard products leverage existing process libraries (e.g., rubber compound formulas, 27-year aftermarket database), while major projects require new material/process R&D (e.g., high-strength aluminum forgings).

Resource Commitment: Major projects need cross-functional teams (Procurement/Legal for supply chain compliance), versus standalone tech teams for standard products.

Validation Depth: OEM projects mandate full-vehicle durability tests (100,000-km road trials), exceeding lab sampling for standard parts.

 

主站蜘蛛池模板: 色欲av永久无码精品无码蜜桃| 亚洲中文字幕精品久久久久久直播| 无码精品毛片波多野结衣| 亚洲色欲色欲www在线看| 国产精品久久久久9999不卡| 免费观看黄网站在线播放| 久久精品人人做人人爱爱漫画| 国产成人免费ā片在线观看| 国产偷国产偷亚洲清高| 国产精品久久久久久一区二区三区| 男女啪啦猛视频免费| 精品久久久中文字幕人妻| 大香j蕉75久久精品免费8| 精品国产福利视频在线观看| 寂寞少妇做spa按摩无码| 欧美成人一区二免费视频| 久久人人97超碰精品| 五月狠狠亚洲小说专区| 国产激情无码一区二区app| 欧美另类与牲交zozozo| 久久婷婷是五月综合色| 99久久re免费热在线| 国产成人8x人网站视频| 精品视频无码一区二区三区| 国精产品48x国精产品| a片在线免费观看| 艳妇臀荡乳欲伦交换在线播放 | 久久无码人妻丰满熟妇区毛片| 国产精品午夜福利不卡120| 日韩精品人妻系列一区二区三区| 国产精品69人妻无码久久| 国产xxx视频在线观看软件| 中文字幕无码日韩专区| 一本大道东京热无码av| 国产成人高清精品免费| 日韩国精品一区二区a片| 毛又多又黑少妇a片视频| 国产午夜福利视频在线观看| 无码成人一区二区| 亚洲a成人无m网站在线| 国产一区二区三区免费观看在线|